You need to upgrade your Flash Player
Press Releases
17/07/2008 Tenova Pyromet celebrates switch-in success in South Africa.  
Download PDF

There was reason to celebrate on Friday, 11 July 2008 when Tenova Pyromet, switched in the TATA 2 second of two furnaces in Richard's Bay.


30/06/2008 Tenova Pyromet to shine in Chinese project  
Download PDF

Leading international furnace and smelter specialist, Tenova Pyromet has been awarded a contract  by the Chinese  Henan Sunshine Silicon Technology Development for the design and supply of equipment for two 39 MVA silicon furnaces  to be built in Henan Province, China


30/06/2008 Tenova receives the Final Acceptance Certificate for the Arcelor Mittal 450 t/h walking beam furnace, Poland  
Download PDF

Tenova LOI Italimpianti Genoa has successfully received the FAC Certificate for the Arcelor Mittal 450 t/h walking beam furnace of the new MSPKK Hot Strip Mill located in Krakow, Poland in the very short period of only four months from the start up.


27/06/2008 Claymont Steel chooses EFSOP Holistic Optimization™ technology  
Download PDF

Claymont Steel Inc., a wholly owned subsidiary of Evraz Group S.A. has placed an order for one (1) Goodfellow EFSOP® process optimization system for their 160 ton electric arc furnace in Claymont, Delaware.


25/06/2008 Tenova to build three walking beam furnaces and two complete roll shops for TKS Compass Project in U.S.A.  
Download PDF

Another very prestigious order has been recently awarded to Tenova, in consortium with German SMS Demag, by TKS-ThyssenKrupp USA for the green field project in Alabama, U.S.A.


13/06/2008 Essar Steel of India chooses Tenova HYLs HYTEMP System for Hazira Works  
Download PDF

Essar Steel has contracted with Tenova HYL to design and install a HYTEMP® Pneumatic Transport System for transporting hot DRI to their Hazira Works melt shop.  The contract calls for a modified HYTEMP® System to transport hot DRI from hot DRI containers to charging bins above the EAF’s


30/05/2008 Tenova LOI Italimpianti successfully commissioned and started-up one CSP Roller hearth furnace for Bhushan Power & Steel Ltd, Orissa India.  
Download PDF

Tenova LOI Italimpianti successfully commissioned the Roller Hearth Furnace Line A supplied for the CSP Bhushan Power & Steel Ltd, Orissa India. The Roller Hearth Furnace is complete with Swivel system for the future installation of the Line B in accordance with the expansion program of the Bhushan plant.


19/05/2008 ArcelorMittal Lazaro Cardenas Signs for Second Module Upgrade with Tenova HYL  
Download PDF

 ArcelorMittal Steel Lazaro Cardenas, in the state of Michoacan, Mexico, has contracted with Tenova HYL for an upgrade of the second module of their 2 million tpy HYL Process plant. This upgrade will make the plant more environmentally friendly by reducing emissions, as well as reducing natural gas consumption by nearly 20%.


13/05/2008 Tenova LOI Italimpianti to supply a rotary hearth furnace with zone separation for Volvo Powertrain  
Download PDF

The Swidish company Volvo Powertrain has awarded LOI Thermoprocess, a Tenova LOI Italimpianti company, a contract to supply a roller earth furnace for the gas carburizing of transmission parts to increase production capacity as its Köping plant.


13/05/2008 Tenova Pyromet impresses in US deal  
Download PDF

As proof that Google gives its users their best options, the name "Tenova Pyromet" recently came up when a US-based mining company was searching for a furnace and smelting expert.


Pages: 19
1 2 3 4 5 6 7 8 9 <10> 11 12 13 14 15 16 17 18 19